Installation manual
Liftgate GPC 22 X-1, Series 11
Document no.: S 20 912 436
23
Version 2021
Chart Platform Measurements
Model
GPC 22 X-1
A
B
inch
9
2 5/16
IMPORTANT:
All bearing points
are sealed with O-rings.
WARNING
Installation at crushing and shearing points
Fingers are at risk of being crushed or sheared when the platform is installed on the lifting gear.
Be careful at the connecting points between the platform and lifting gear.
A
B
Bring the platform with forklift or crane to the
lifting mechanism and mount the
bolt.
Installation of the platform
Remove the pins in the liftarm to the installation
fixture. Lower the lift arm far enough down so you
can install the platform. Grease the upper lift arm
and tilt cylinder bearings before installing the pins
with the special grease, part no S 20840405
supplied.
Install the O-rings before attaching the platform
put
on the O-rings (see also page 40); place the lift arms and
the tilting cylinder; install and secure the bolts.
assemble o-rings
to arms as shown
Apply grease to bearings
located in arms prior
assembly
lowered
Summary of Contents for GPC 22 X1
Page 2: ......