Preparing for installation
21
Line up the installation adapters on the lifting gear with the
manufacturer’s holes
in the vehicle chassis (see Fig. 27).
3.8 Mounting holes on the vehicle
IMPORTANT:
Follow the vehicle manufacturer’s installation guidelines.
Find the mounting holes on the vehicle.
Make any new mounting holes that are necessary.
If necessary, weld spacer sleeves onto the vehicle chassis.
Remove underbody coating in the area of the mounting points (contact surfaces
between vehicle and installation adapters).
Seal any areas of the vehicle body that are thus exposed (with corrosion
protection).
Fig. 27
Summary of Contents for GPC X1-LDF
Page 1: ...GPC X1 LDF liftgate Installation Manual for Mercedes Benz Sprinter...
Page 11: ...Introduction 5 2 1 4 Accessories kit Fig 4...
Page 13: ...Introduction 7 2 1 5 Installation adapter kit 22 911 216 Fig 5...
Page 71: ...Useful information 65 8 2 Assembly drawings of installation adapters...
Page 72: ...Useful information 66 8 3 Electrical circuit diagram...
Page 73: ...Useful information 67 8 4 Hydraulic circuit diagram...