Installation
36
4.8 Unpacking the platform
Check the scope of delivery for completeness (see pages 4f.)
IMPORTANT:
Dispose of all packing materials in accordance with environmental
regulations.
4.9 Raising the platform
Lift the platform using suitable means, e.g. crane, assembly table, or pallet truck
and pallet (see Fig. 54).
Fig. 54
Summary of Contents for GPC X1-LDF
Page 1: ...GPC X1 LDF liftgate Installation Manual for Mercedes Benz Sprinter...
Page 11: ...Introduction 5 2 1 4 Accessories kit Fig 4...
Page 13: ...Introduction 7 2 1 5 Installation adapter kit 22 911 216 Fig 5...
Page 71: ...Useful information 65 8 2 Assembly drawings of installation adapters...
Page 72: ...Useful information 66 8 3 Electrical circuit diagram...
Page 73: ...Useful information 67 8 4 Hydraulic circuit diagram...