Installation
37
4.10 Installing the platform
WARNING
Installation at crushing and shearing points
Fingers are at risk of being crushed or sheared when the platform is installed on the
lifting gear.
Be careful at the connecting points between the platform and lifting gear.
Remove the transport lock (cable tie).
R
e
m
ov
e
th
e
pi
ns
(a,
b,
c)
(s
ee
Fig. 55).
Legend:
Item a
Pin
Part No. 20 905 057
Item b
Pin
Part No. 20 840 722
Item c
Pin
Part No. 20 907 775
Thread 6 O-rings (accessories kit parts list
– Item No. 10) onto the steel bushings
(see Fig. 56).
Exc
erp
t
fro
m
par
ts
list:
acc
ess
ori
es
kit
Item No. Part No.
Description
Standard
Qty.
10
20 840 117
O-ring
40.65 x 5.33
6
Fig. 55
Fig. 56
Summary of Contents for GPC X1-LDF
Page 1: ...GPC X1 LDF liftgate Installation Manual for Mercedes Benz Sprinter...
Page 11: ...Introduction 5 2 1 4 Accessories kit Fig 4...
Page 13: ...Introduction 7 2 1 5 Installation adapter kit 22 911 216 Fig 5...
Page 71: ...Useful information 65 8 2 Assembly drawings of installation adapters...
Page 72: ...Useful information 66 8 3 Electrical circuit diagram...
Page 73: ...Useful information 67 8 4 Hydraulic circuit diagram...