Installation
40
Lift the tip of the platform until the closing-rod bearing point (attachment point for
the closing rod) is aligned with the swing-arm bearing point (bottom attachment
point on the platform) (see Fig. 61).
IMPORTANT:
If necessary, slightly retract or extend the closing rod.
Insert the pin (c).
Mount the screw (8) from the accessories kit to secure the pin (Fig. 62).
Excerpt from parts list: accessories kit
Item No. Part No.
Description
Standard
Qty.
8
20 901 791
Countersunk screw with
hexagon socket
DIN 7991 - M10x12 - A2
1
Legend:
Item c
Pin
Part No. 20 907 775
Fig. 61
Fig. 62
Summary of Contents for GPC X1-LDF
Page 1: ...GPC X1 LDF liftgate Installation Manual for Mercedes Benz Sprinter...
Page 11: ...Introduction 5 2 1 4 Accessories kit Fig 4...
Page 13: ...Introduction 7 2 1 5 Installation adapter kit 22 911 216 Fig 5...
Page 71: ...Useful information 65 8 2 Assembly drawings of installation adapters...
Page 72: ...Useful information 66 8 3 Electrical circuit diagram...
Page 73: ...Useful information 67 8 4 Hydraulic circuit diagram...