Adjusting the liftgate
51
If necessary, adjust the height of the foldover section on the right side of the platform
using the right-hand adjustment fork (2) (adjustment screw accessible from below)
(see Fig. 78).
Legend:
Item 1
Adjustment screw
Item 2
Adjustment fork
Item 3
Hex bolt
Item 4
Support arm
Use the adjustment screw (1) to set the support arm (4) so that the platform stop
rests on and is supported by the support arm (4).
IMPORTANT:
At the same time, check the stop (Section 5.4) on the foldover
section.
Rotating the adjustment screw (1) to the right lifts the support arm (4).
Rotating the adjustment screw (1) to the left lowers the support arm (4)
(see Fig. 79).
When finished adjusting, tighten the bolt (3) for securing the torsion bar to
11
5
N
m
(se
e
tor
qu
e
tab
le
on
pa
ge
68).
Fig. 78
Fig. 79
Summary of Contents for GPC X1-LDF
Page 1: ...GPC X1 LDF liftgate Installation Manual for Mercedes Benz Sprinter...
Page 11: ...Introduction 5 2 1 4 Accessories kit Fig 4...
Page 13: ...Introduction 7 2 1 5 Installation adapter kit 22 911 216 Fig 5...
Page 71: ...Useful information 65 8 2 Assembly drawings of installation adapters...
Page 72: ...Useful information 66 8 3 Electrical circuit diagram...
Page 73: ...Useful information 67 8 4 Hydraulic circuit diagram...