50 CHAPTER 12: ELECTRICAL SYSTEM
Gas Generator - Starting/Running/Stopping
1.
Run the bilge blowers for a minimum of four minutes before starting the generator.
•
The blower switch is located on the AC panel near the generator controls.
•
If your boat is running below cruising speed, leave the blowers on while the generator is running.
2.
Make sure the generator’s seawater pickup seacock is open before starting and during running of
the generator.
3.
Make sure that the battery switch is turned to position "1" or "2".
4.
Slide the master breaker lockouts to cover the dockside master breakers and reveal the generator
master breakers.
5.
Switch the “GENERATOR LINE ONE MASTER” and the “GENERATOR/LINE ONE TRANSFER”
master breakers on.
6.
On the AC panel, press up and hold the oil pressure switch (labeled "PRE-HEAT") and the "START" switch at
the same time until the generator starts.
7.
Turn on each individual component breaker as required.
To shut off the generator, press up and hold the “STOP” switch until the generator completely shuts down.
AC PANEL, DUAL SHORE POWER & GENERATOR
PREHEAT
START
STOP
BLOWER
SELECTOR SWITCH
DOCKSIDE
MASTER
GENERATOR
MASTER SWITCHES
MASTER BREAKER
LOCKOUTS
Summary of Contents for 3100 SCR
Page 1: ......
Page 2: ......
Page 65: ...CHAPTER 12 ELECTRICAL SYSTEM 59 AC Electrical System SHEET 3 OF 4...
Page 66: ...60 CHAPTER 12 ELECTRICAL SYSTEM Connector List SHEET 4 OF 4...
Page 67: ...Owner s Notes...
Page 68: ...Owner s Notes...
Page 69: ...Owner s Notes...
Page 70: ...Owner s Notes...
Page 71: ......
Page 72: ......