52 CHAPTER 12: ELECTRICAL SYSTEM
Diesel Generator - Starting/Running/Stopping
•
The diesel generator features a
Westerbeke control panel (top
illustration).
•
The generator controls on the
AC panel are inactive (bottom
illustration).
1.
Run the bilge blowers for a
minimum of four minutes
before starting the generator.
•
The blower switch is
located on the AC panel
near the inactive generator
controls.
•
If your boat is running
below cruising speed, leave
the blowers on while the
generator is running.
2.
Make sure the generator’s
seawater pickup seacock is
open before starting and dur-
ing running of the generator.
3.
Make sure that the battery
switch is turned to position
"1" or "2".
4.
Slide the master breaker
lockouts to cover the dock-
side master breakers and
reveal the generator master
breakers.
5.
Switch on the, "GENERA-
TOR LINE ONE MASTER"
and the "GENERATOR /
LINE ONE TRANSFER"
master breakers.
6.
On the Westerbeke panel,
press "START" until the gen-
erator starts.
7.
Turn on each individual
component breaker
as required.
To shut off the generator, press "STOP" until the generator completely shuts down.
START
BUTTON
INACTIVE
BLOWER
SWITCHES
COOLANT/OIL PRESSURE
HOUR
LED PROPORTIONAL
FUEL SHUTOFF
ENGINE/GENERATOR
WESTERBEKE GENERATOR CONTROL PANEL
"ON" LIGHT (GREEN)
SOLENOID LIGHT (YELLOW)
WARNING LIGHT (RED)
LOAD INDICATOR
120 VOLT AC PANEL
STOP
BUTTON
METER
Summary of Contents for 3100 SCR
Page 1: ......
Page 2: ......
Page 65: ...CHAPTER 12 ELECTRICAL SYSTEM 59 AC Electrical System SHEET 3 OF 4...
Page 66: ...60 CHAPTER 12 ELECTRICAL SYSTEM Connector List SHEET 4 OF 4...
Page 67: ...Owner s Notes...
Page 68: ...Owner s Notes...
Page 69: ...Owner s Notes...
Page 70: ...Owner s Notes...
Page 71: ......
Page 72: ......