5 Commissioning
While commissioning the machine, the following
safety instructions must be observed in order to
eliminate the risk of personal injuries, property
damage and damages to the machine.
Commissioning of the machine is to be
performed by qualified personnel only, under
the strictest observance of the relevant
regulations on health and safety.
Prior to initial start-up please make sure that
all tools and foreign objects have been
removed from the machine.
Check all electrical connections before starting
the machine for the first time.
Activate all safety devices and Emergency
OFF switches before starting up the machine.
Please consult the chapter on
health and
safety instructions
as well.
1. Inspection prior to the initial commissioning
Prior to the initial commissioning of the machine kindly
go through the following checklist:
Are all protective guards and safety devices fitted?
Has transportation caused any damage to the machine?
Are all accessible bolted joints tight enough?
Are all connection cables of the equipment and the
connection of the Emergency
– OFF switch intact?
Summary of Contents for TR 4103
Page 4: ...4 2 Structure Top view of POT HANDLING ROBOT TR 4103 rear right left front ...
Page 60: ...60 9 List of spare parts ...
Page 66: ...66 10 Pneumatic and electrical diagrams ...
Page 67: ...67 Pot collector Staggered order Swivel drive ...
Page 68: ...68 Pot collector staggered order Swivel drive additional swivelling ...