26
2. Initial start-up of the machine
Control panel Omron NQ5 TQ010-B
– display and keyboard
In order to test run the machine after installation please go through the following
procedure:
a)
For a smooth operation of the machine it is essential that the operating pressure be
set properly.
The adjustment of pressure can be performed on the service unit.
The pressure must reach a minimum value of 5 bar and must not exceed a maximum
value of 9 bar. Should the operating pressure fall below the minimum of 5 bar, the
pressure control will be activated and the machine will stop.
Summary of Contents for TR 4103
Page 4: ...4 2 Structure Top view of POT HANDLING ROBOT TR 4103 rear right left front ...
Page 60: ...60 9 List of spare parts ...
Page 66: ...66 10 Pneumatic and electrical diagrams ...
Page 67: ...67 Pot collector Staggered order Swivel drive ...
Page 68: ...68 Pot collector staggered order Swivel drive additional swivelling ...