background image

28

Alternate

Gas Line

Location

Plug in

Alternate

Gas Line

Hole

Gas Valve

Burners

Manual Shut Off Valve

(upstream from ground joint pipe union)

Drip Leg

Grommet

in Standard

Gas Line

Hole

*Ground

Joint

Pipe Union

*Ground

Joint

Pipe Union

*NOTE: Union may be inside furnace cabinet where allowed by local codes.

f

Igure

 33 

Drip Leg

Plug in Main Gas Line Hole

Alternate

Union

Location

Manual Shut Off Valve

          (upstream from

            ground joint pipe union)

Gas

Valve

Burners

Drain Trap

Manifold

Plug in Alternate Gas Line Hole

Grommet in

Standard Gas Line Hole

f

Igure

 34 

•  

Connect the furnace to the building piping by one of 

the following methods:

    

– 

Rigid metallic pipe and fittings.

    

– 

Semi-rigid metallic tubing and metallic fittings.   

Aluminum alloy tubing must not be used in exterior 

locations.  In order to seal the grommet cabinet 

penetration, rigid pipe must be used to reach the 

outside of the cabinet.  A semi-rigid connector to the 

gas piping may be used from there.

•  

Use listed gas appliance connectors in accordance 

with their instructions.  Connectors must be fully in the 

same room as the furnace.

•  

Protect connectors and semirigid tubing against 

physical and thermal damage when installed.  Ensure 

aluminum-alloy tubing and connectors are coated to 

protect against external corrosion when in contact 

with masonry, plaster, or insulation, or subjected to 

repeated wetting by liquids such as water (except rain 

water), detergents, or sewage.

The gas piping may enter the left or right side of the 

furnace cabinet. The installer must supply rigid pipe long 

enough to reach the outside of the cabinet to seal the 

grommet cabinet penetration.  A semi-rigid connector to the 

gas piping can be used outside the cabinet per local codes. 

1/2” NPT pipe and fittings are required.  For models with an 

“L” shaped manifold, a 4 1/2” long nipple is required.  For 

models with a hook shaped manifold, a 2” long nipple is 

required.

A semi-rigid connector to the gas piping can be used 

outside the cabinet per local codes. From the elbow, the 

length of pipe and the fittings required will vary by the side 

chosen, location of union and cabinet width. The union may 

be placed inside or outside of the cabinet.

Alternate

Gas Line

Location

Gas Valve

Burners

Manual Shut Off Valve

(upstream from

ground joint

         pipe union)

Drip Leg

Grommet

in Standard

Gas Line

Hole

*Ground

Joint

Pipe

Union

*Ground

Joint

Pipe

Union

*NOTE: Union may be inside furnace cabinet where allowed by local codes.

Manifold

f

Igure

 32 

Summary of Contents for Amana CVC96 BA Series

Page 1: ...ver if there is a direct conflict between existing practices and the content of this manual the precautions listed herein take precedence RECOGNIZE THIS SYMBOL AS A SAFETY PRECAUTION NOTE Please conta...

Page 2: ...te of Massachusetts 19 Condensate Drain Lines Drain Trap 21 Gas Supply and Piping 26 Propane Gas High Altitude Installations 26 Duct Work 30 Electrical Connections 33 Startup Procedure Adjustment 40 N...

Page 3: ...LOSION HAZARD AVERTISSEMENT RISQUE D INCENDIE OU D EXPLOSION Si les consignes de s curit ne sont pas suivies la lettre cela peut entra ner la mort de graves blessures ou des dommages mat riels Ne jama...

Page 4: ...trical connections circulating air temperature rise minimum or maximum CFM WARNING To prevent property damage personal injury or death due to fire do not install this furnace in a mobile home trailer...

Page 5: ...nces In their absence follow the latest edition of the National Fuel Gas Code NFPA 54 ANSI Z223 1 and or CAN CSA B149 1 15 Installation Codes local plumbing or waste water codes and other applicable c...

Page 6: ...hylene printing inks chlorinated waxes or cleaners paint removers chlorine based swimming pool chemicals varnishes water softening chemicals hydrochloric acid carbon tetrachloride cements and glues de...

Page 7: ...nit install the furnace upstream or in parallel with the cooling coil unit Premature heat exchanger failure will result if the cooling unit is placed ahead of the furnace For vertical upflow or downfl...

Page 8: ...rmining the combustion air requirements for the appliances Clearance in accordance with local installation codes the requirements of the gas supplier and the manufacturer s installation instructions D...

Page 9: ...t hood relief opening after 5 minutes of main burner operation Use the flame of a match or candle 8 If improper venting is observed during any of the above tests the venting system must be corrected i...

Page 10: ...cun des appareils raccord s au syst me de ventilation au moment de sa mise en marche alors que tous les autres appareils raccord s au syst me de ventilation ne sont pas en marche 1 Sceller toutes les...

Page 11: ...n the U S A and Canada Manufacturers Installation instructions for these products must be followed These products have specific instructions for installing joining and terminating Do not mix materials...

Page 12: ...flue products Additionally it is the responsibility of the installer to ensure that all piping and connections possess adequate structural integrity and support to prevent flue pipe separation shiftin...

Page 13: ...e or the anticipated snow level and be at least 12 inches from any vertical wall including any anticipated snow build up A vent termination shall not terminate over public walkways or over an area whe...

Page 14: ...B149 1 15 takes precedence over the preceding termination description Canadian Vent Pipe Combustion Air Pipe Requirements All installations in Canada must conform to the requirements of CAN CSA B149 1...

Page 15: ...N A 3 151 144 137 130 123 116 109 102 2 120 115 110 105 100 95 90 85 3 185 178 171 164 157 150 143 136 2 85 80 75 70 65 60 55 50 3 168 161 154 147 140 133 126 119 2 40 35 30 25 20 15 10 5 3 120 113 10...

Page 16: ...flange to the cabinet CAUTION Be sure not to damage internal wiring or other components when reinstalling coupling and screws Figure 11 WARNING The rubber elbow is not designed to support a load When...

Page 17: ...8 measured from the front edge of the cabinet in line with the knock out To use the alternate combustion air location 1 Remove screws and combustion air flange from cabinet 2 Insert cabinet plug in u...

Page 18: ...nnection of pipes to the furnace refer to the Vent Flue Pipe and Combustion Pipe Standard Furnace Connections or Alternate Furnace Connections 90 ELBOWS 3 24 Alternate Horizontal Vent Termination Dual...

Page 19: ...e Side Wall Vent Kit p n 0170K00000S or 0170K00001S for installation specifications Vertical Installation H orizontal Installation Figure 21 SPECIAL INSTRUCTIONS FOR PRODUCTS INSTALLED IN THE STATE OF...

Page 20: ...equipment is to be installed In addition the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional...

Page 21: ...rain Exiting Right Side 1 Locate and Install the 45 pipe hose drain coupling from the outside of the cabinet barbed end goes in the cabinet through hole in the right side of the cabinet and secure wit...

Page 22: ...lied Drain section for instructions on field supplied nstalled drain on outlet of furnace trap Upflow model installed horizontally with left side down Minimum 5 clearance is required for the drain tra...

Page 23: ...he clamps from the two drain tubes on the trap 2 Remove the two screws holding the drain trap to the blower deck 3 Remove the trap and hoses from the blower deck 4 Remove the two plugs from the left s...

Page 24: ...holes with the pre drilled holes in the furnace and secure with 2 screws removed in step 2 7 Refer to Field Supplied Drain section for instructions on field supplied installed drain on outlet of furna...

Page 25: ...end of hose 4 on the side port of vent drain elbow and secure with a gold clamp 10 Insert a diameter PVC pipe factory installed into hose 4 and secure with a gold clamp 11 Insert the non grommet end...

Page 26: ...fice size Propane Gas Conversion WARNING Possible property damage personal injury or death may occur if the correct conversion kits are not installed The appropriate kits must be applied to ensure saf...

Page 27: ...utoff valve and the furnace Tighten all joints securely Connection method must be in compliance with all local and national codes US National Fuel Gas Code NFGC NFPA 54 2015 ANSI Z223 1 2015 and the I...

Page 28: ...against physical and thermal damage when installed Ensure aluminum alloy tubing and connectors are coated to protect against external corrosion when in contact with masonry plaster or insulation or su...

Page 29: ...urnace manifold with all gas appli ances in operation Maintaining proper gas pressure depends on three main factors 1 Vaporization rate depending on temperature of the liquid and wetted surface area o...

Page 30: ...check for closed dampers registers undersized and or oversized poorly laid out duct work NOTE The temperature rise of the furnace must be within the temperature rise range listed on the furnace ratin...

Page 31: ...ed in either the central return register or in the return air duct work Bottom Return Air Opening Upflow Models The bottom return air opening on upflow models utilizes a lance and cut method to remove...

Page 32: ...greater than 25 W C In some installations the minimum filter size required will not lend itself to a filter installation on the side of the furnace The installation of a centrally installed air clean...

Page 33: ...ified on the unit rating plate Power supply to the furnace must be NEC Class 1 and must comply with all applicable codes The furnace must be electrically grounded in accordance with local codes or in...

Page 34: ...le plugs WARNING To prevent personal injury or death due to electric shock disconnect electrical power before installing or servicing this unit Line voltage connections can be made through either the...

Page 35: ...g operation make system menu adjustments add site visit notes and run system testing of all operational modes heat cool fan directly from the phone The phone application is also capable of directly up...

Page 36: ...stem will remain in charge mode high speed for 60 minutes before timing out c The installer must manually shut off charge mode once complete 2 Two stage outdoor units using the CoolCloud HVAC applicat...

Page 37: ...0 for high stage operation 6 Confirm thermostat heating and cooling calls function properly with equipment Quick Start Guide for Gas Heat Only Setup No Outdoor Unit EXTREMELY IMPORTANT The furnace onl...

Page 38: ...and to then permanently select options within those menus NOTE After scrolling to the desired option within a menu that option may be flashing on the 7 segment displays This indicates the option has...

Page 39: ...airflow from the HVAC system to function accordingly 1 Make sure the installed 24VAC thermostat is capable of controlling the accessory or accessories 2 Connect the appropriate accessory control wires...

Page 40: ...five minutes then smell for gas Be sure check near the floor as some types of gas are heavier than air 7 If you smell gas after five minutes immediately follow the safety instructions in the Safety C...

Page 41: ...lve and disconnect manometer Reinstall plug before turning on gas to furnace 6 Turn OFF any unnecessary gas appliances stated in step three Gas Manifold Pressure Measurement and Adjustment CAUTION To...

Page 42: ...l variations in gas pressure should be made by adjusting the gas valve pressure regulator The manifold pressure must be measured with the burners operating To measure and adjust the manifold pressure...

Page 43: ...is rate it would take 46 seconds to consume one cu ft of gas 3600 46 78 This tells us that in one hour the furnace would consume 78 cu ft of gas The typical value range for 1 cu ft of natural gas is a...

Page 44: ...onditions Igniter warm up begins upon Inducer draft blower step to low speed and presence of closed low stage pressure switch contacts Gas valve opens at end of igniter warm up period delivering gas t...

Page 45: ...which uses the principle of flame rectification to determine the presence or absence of flame Burner Flame Figure 65 TROUBLESHOOTING Electrostatic Discharge ESD Precautions NOTE Discharge body s stat...

Page 46: ...cket near furnace MAINTENANCE Annual Inspection WARNING To avoid electrical shock injury or death disconnect electrical power before performing any maintenance If you must handle the igniter handle wi...

Page 47: ...ordered by description Parts are available from your distributor Functional Parts List Gas Valve Blower Motor Gas Manifold Blower Wheel Natural Gas Orifice Blower Mounting Bracket Propane Gas Orifice...

Page 48: ...rflow Off Delay Time default 60 seconds Hnd Heat Pump Heating Airflow On Delay Time default 5 seconds H P Select the range that includes the desired compressor RPS for inverter heating operation See i...

Page 49: ...ngle Stage single stage non comm units AC1 Compressor Cooling Low Stage communicating units AC2 Compressor Cooling High Stage communicating units dF1 Defrost Low Stage Gas Heat dF2 Defrost High Stage...

Page 50: ...ata set is correct for the specific model re populate data using correct memory card if required Furnace operates at reduced performance Airflow delivered is less than expected E Circulator blower mot...

Page 51: ...and sensor if coated and or oxidized Check flue piping for blockage proper length elbows and termination Verify proper induced draft blower performance Furnace fails to operate EE1 Low stage pressure...

Page 52: ...Verify and correct unit ground wiring if needed Check igniter output from control replace if necessary Furnace fails to operate on high stage furnace operates normally on low stage Induced draft blow...

Page 53: ...blower compartment Check filters and ductwork for blockage clean filters or remove obstruction Check circulator blower speed and performance correct speed or replace blower motor if necessary Tighten...

Page 54: ...ME GN GREEN GR PRESSURE SWITCH FRONT COVER C VAC TO UNIT MUST BE 1 BL RD AND GROUNDED 1 115 WH SWITCH PRESS FIELD SPLICE FIELD GND LOW VOLTAGE FIELD GN BL BR WH NO LIMIT CONTROL AUTO RESET PRIMARY WH...

Page 55: ...55 THIS PAGE IS INTENTIONALLY LEFT BLANK...

Page 56: ...ebec residents to register their product does not diminish their warranty rights For Product Registration please register as follows Goodman Brand products https www goodmanmfg com product registratio...

Reviews: