22

NOTE: The software update may take up to 20 

minutes to complete.

Quick Start Guide For Communicating 

Outdoor Units

EXTREMELY IMPORTANT: 

For all cooling calls, the 

system only requires a single Y input from the thermostat.  

For all heating calls (including dual fuel applications), the 

system only requires a single W input from the thermostat. 

Internal algorithms will control all available cooling and 

heating stages, including dual fuel operation based on 

these inputs. Any single-stage 24VAC thermostat is 

applicable. For proper operation, set up the thermostat to 

control a single-stage AC outdoor unit and a single-stage 

gas furnace. The control board does not accommodate an 

O wire thermostat input (reversing valve signal). If using a 

heat pump, set up the thermostat, as stated above. Setting 

the thermostat for the heat pump control or multi-stage 

control may result in incorrect performance.

1.  Connect all necessary thermostat wires to the 

thermostat connector on the furnace control, as 

instructed by the applicable wiring diagrams shown in 

this section.

2.  Connect the 1 & 2 wires between the indoor and 

outdoor unit for communicating operation.   

NOTE:

 Verify two-stage outdoor units include a 

24 VAC transformer (for outdoor control board 

power). Two-stage outdoor units may not behave 

appropriately without this 24 VAC transformer.

R
C

G

Y

Optional

Optional

Optional if

feature

supported by

thermostat

INDOOR

BOARD TERMINAL

CONNECTIONS

OUTDOOR

BOARD TERMINAL

CONNECTIONS

OUTDOOR

TRANSFORMER

1

2

C

R
C

G

Y

1

2

C

Communicating Two-Stage Air Conditioner or Heat Pump

Figure 32

1

2

C

R
C

G

Y

Optional

Optional

Optional 

INDOOR

BOARD TERMINAL

CONNECTIONS

OUTDOOR

BOARD TERMINAL

CONNECTIONS

1

2

C

R
C

G

Y

24 VAC

Thermostat

Communicating Inverter Air Conditioner or Heat Pump 

Figure 33

3. 

Download the 

CoolCloud 

HVAC phone application for 

charging and to configure/test system operations.

NOTE: When new versions of Bluetooth 

Communication Software and Furnace Control 

Software are available, the phone application 

notifies the user. Software updates are classified 

as either optional or mandatory and installed by 

using the phone application. Ensure installation 

of all mandatory software updates. Review notes 

for optional software updates and install if 

necessary.

NOTE: If an E11 code exists for the inverter system 

immediately after line voltage is applied (code 

shown in the CoolCloud HVAC phone application 

or displayed on the inverter control), the System 

Verification Test needs to be completed before 

any other operation. See the following procedure.

1.  Allow the system to remain Idle for 5 minutes.

2. 

Turn the system verification test on either by using the 

CoolCloud phone application, or by entering the 

SUt 

menu through the furnace pushbuttons.

3.  Wait for the test to complete.

Charging

1.  Inverter units using the 

CoolCloud

 HVAC phone 

application or control board push button:

a.    Charge the inverter units by setting the CR9 menu 

(Charge Mode) to ON through the furnace control 

board pushbuttons or the CoolCloud HVAC phone 

application.

b.    The System will remain in charge mode (high 

speed) for 60 minutes before timing out.

c. 

  The installer must manually shut off charge mode 

once complete.

Summary of Contents for Amana MVS96 Series

Page 1: ...se a matter of thinking before acting Most dealers have a list of specific good safety practices follow them The precautions listed in this Installation Manual are intended as supplemental to existing...

Page 2: ...s the applicable Industry Canada technical specifications The manufacturer of the intentional radiator model no BGM111 is Silicon Laboratories Finland Oy which can be contacted by calling 617 951 0200...

Page 3: ...rged to the outdoors Connect this furnace to an approved vent system only as specified in VENT FLUE PIPE COMBUSTION AIR PIPE section of this manual Never test for gas leaks with an open flame Use a co...

Page 4: ...properly winterized and the water source closed In the event that the building may be exposed to freezing tempera tures and will be vacant any hydronic coil units should be drained as well and in such...

Page 5: ...ntrol module or connecting wiring following the discharge process in step 2 Use caution not to recharge your body with static electricity i e do not move or shuffle your feet do not touch ungrounded o...

Page 6: ...rds Institute 25 West 43rd Street 4th Floor New York NY 10036 National Fire Protection Association 1 Batterymarch Park Quincy MA 02169 7471 CSA International 8501 East Pleasant Valley Road Independenc...

Page 7: ...garage position the furnace so that the burners and ignition source are located not less than 18 above the floor Protect the furnace from physical damage by vehicles If the furnace is installed horizo...

Page 8: ...rmostat Location The thermostat should be placed approximately five feet from the floor on a vibration free inside wall in an area having good air circulation Do not install the thermostat where it ma...

Page 9: ...awl space it must be suspended from the floor joist or supported by a concrete pad Never install the furnace on the ground or allow it to be exposed to water Figure 3 Front Cover Pressure Switch Tube...

Page 10: ...t 5000 ft Manifold Pressure at 7500 ft CO2 Natural Gas Max Allowable Venting 3 in only MVS960603BU 100 ft MVS960805CU 80 ft 2 5 w c 2 4 w c 6 5 8 5 Table 2 Vent Pipe Combustion Air Pipe This manual wi...

Page 11: ...vent connector and must not be vented into masonry chimney A masonry chimney may be used as a chase or passage way for approved venting materials providing the masonry chimney is not also being used t...

Page 12: ...60805CU MODEL Pipe Size in Number of Elbows MVS960603BU 0 4 999 FT ALTITUDE 5 000 7 500 FT ALTITUDE MVS960805CU 3 3 100 MODEL Pipe Size in Number of Elbows MVS960603BU 69 93 87 81 75 63 57 80 43 37 73...

Page 13: ...aft blower outlet When using the horizontal alternate vent configuration you must use the RF000142 vent drain kit See Figures 10 11 follow steps below NOTE In the horizontal left installation position...

Page 14: ...The vent termination of a direct vent application must terminate at least 12 from any opening through which flue gases may enter a building door window or gravity air inlet The vent termination of ven...

Page 15: ...HEIGHT DIFFERENCE 12 MIN TO ROOF OR HIGHEST ANTICIPATED SNOW LEVEL Vertical Termination Figure 14 STRAIGHT ELBOWS Figure 15 VENT FLUE TEE or 45 ELBOW TURNED DOWN or 90 ELBOW TURNED DOWN OPTIONAL 12 M...

Page 16: ...es If more than one direct vent furnace is to be installed vertically through a common roof top maintain the same minimum clearances between the exhaust vent and air intake terminations of adjacent un...

Page 17: ...ward slope toward the drain Do not trap the drain line in any other location than at the drain trap supplied with the furnace If the drain line is routed through an area which may see temperatures nea...

Page 18: ...adapter 45 barb pipe adapter Installer selects right or left side drain and installs this hose accordingly Figure 25 Drain Exiting Right Side 1 Locate and Install the 45 pipe hose drain coupling from...

Page 19: ...Location Figure 27 Horizontal Installation with Left Side Down Minimum 5 clearance is required for the drain trap beneath the furnace See Front Cover Pressure Switch Tube Location on Figure 27 1 Remo...

Page 20: ...oving hole plugs Wiring Harness The wiring harness is an integral part of this furnace Wires are color coded for identification purposes Refer to the wiring diagram for wire routings If any of the ori...

Page 21: ...ulator blower operation filter removal or routine maintenance To ensure proper unit grounding the ground wire should run from the furnace ground screw located inside the furnace junction box all the w...

Page 22: ...2 C R C G Y 1 2 C Communicating Two Stage Air Conditioner or Heat Pump Figure 32 1 2 C R C G Y Optional Optional Optional INDOOR BOARD TERMINAL CONNECTIONS OUTDOOR BOARD TERMINAL CONNECTIONS 1 2 C R C...

Page 23: ...nd is not an indication that the control board needs replacement EXTREMELY IMPORTANT For two stage gas heating the system only needs a single W input Internal algorithms will control the staging of th...

Page 24: ...2 5 1000 3 8 1520 5 1 2040 1 3 520 2 6 1040 3 9 1560 5 2 2080 1 4 560 2 7 1080 4 1600 5 3 2120 1 5 600 2 8 1120 4 1 1640 5 4 2160 1 6 640 2 9 1160 4 2 1680 5 5 2200 1 7 680 3 1200 4 3 1720 5 6 2240 1...

Page 25: ...ations The connection is designated as CONDENSATE IN OUT on the control board By default the connected AUX switch is normally closed and opens when the water level in the evaporator coil base pan reac...

Page 26: ...changing any electrical wiring The accessory load specifications are as follows EAC 1 0 AMP maximum at 120 VAC Table 6 The furnace integrated control module is equipped with a line voltage accessory...

Page 27: ...ns in the Safety Considerations on page 3 of this manual If you do not smell gas after five minutes move the furnace gas valve manual control to the ON position 8 Replace the burner compartment door 9...

Page 28: ...and chips If old pipe is used be sure it is clean and free of rust scale burrs chips and old pipe joint compound Use pipe joint compound on male threads ONLY Always use pipe joint compound pipe dope t...

Page 29: ...abinet Alternate Gas Line Location Plug in Alternate Gas Line Hole Ground Joint Pipe Union Gas Valve Ground Joint Pipe Union Manual Shut Off Valve upstream from ground joint pipe union Grommet in Stan...

Page 30: ...static rating Total external static refers to everything external to the furnace cabinet Cooling coils filters ducts grilles registers must all be considered when reading your total external static pr...

Page 31: ...and air leakage When the furnace is heating the temperature of the return air entering the furnace must be between 55 F and 100 F Filters Read This Section Before Installing The Return Air Duct work...

Page 32: ...rated manometer or appropriate gas pressure gauge at either the gas valve inlet pressure tap or the gas piping drip leg See White Rodgers 36J22Y 204 gas valve figure below for location of inlet pressu...

Page 33: ...m 10 Remove the manometer hose from the hose barb fitting or outlet pressure tap 11 Replace outlet pressure tap White Rodgers 36J22 valve Turn outlet pressure test screw in to seal pressure port clock...

Page 34: ...eters must not be influenced by radiant heat by being able to see the heat exchanger 3 Subtract the return air temperature from the supply air temperature to determine the air temperature rise Allow a...

Page 35: ...avoid personal injury or death due to electri cal shock disconnect electrical power BEFORE performing any service or maintenance Annual Inspection The furnace should be inspected by a qualified instal...

Page 36: ...fied servicer using emery cloth or steel wool Following cleaning the flame sense signal should be above 3 micro amps Flue Passages Qualified Servicer Only The heat exchanger flue passageways should be...

Page 37: ...s able to consecutively satisfy the thermostat under the set target time for this number of cycles the system will transition to the heat pump for primary heating SdP Menu is enabled if the CFS menu i...

Page 38: ...ommunicating units AC Compressor Cooling Single Stage single stage non comm units AC1 Compressor Cooling Low Stage communicating units AC2 Compressor Cooling High Stage communicating units dHU Dehumid...

Page 39: ...ensor Furnace fails to operate E1 Analog Pressure Error Blocked Vent Error Need to check the APS Sensor or its connection if this error is occurred The failure conditions occur as per the following fo...

Page 40: ...erate Pressure switch circuit is closed at start of heating cycle Pressure switch contacts sticking Short in pressure switch circuit wiring Replace pressure switch Repair short in wiring Induced draft...

Page 41: ...rom control replace if necessary Furnace fails to operate Polarity of 115 volt AC is reversed Poor unit ground Correct polarity check and correct wiring if necessary Verify proper ground correct if ne...

Page 42: ...URNACE MUST BE REPLACED PK PLUG CONNECTION 2 4 BK DOOR OPEN OPEN WHEN DOOR SWITCH COMPARTMENT BLOWER SWITCH TEMPERATURE GND C BLOWER CIRCULATOR JUNCTION 40 VA 60 HZ DISCONNECT GAS VALVE 2 MANUFACTURER...

Page 43: ...erence between Supply and Return Temperatures DB F GAS PRESSURES Gas Inlet Pressure IN W C Gas Manifold Pressure Low Fire IN W C Gas Manifold Pressure High Fire IN W C Gas Type NG Natural Gas LP Liqui...

Page 44: ...purchased to be directed to the feedback page GOODMAN BRAND AMANA BRAND GOODMAN BRAND AMANA BRAND PRODUCT REGISTRATION Thank you for your recent purchase Though not required to get the protection of...

Reviews: