BODY STRUCTURE [PANEL REPLACEMENT]
09-80B–84
ROOF PANEL INSTALLATION[PANEL REPLACEMENT]
id098008744400
1. When installing new parts, measure and adjust the body as necessary to conform with standard dimensions.
2. Drill holes for the plug welding before installing the new parts.
3. After temporarily installing new parts, make sure the related parts fit properly.
End Of Sie
ROOF PANEL
19
22
22
25
acxuub00000136
3419-1U-06C(09-80B).fm 84 ページ 2006年3月24日 金曜日 午後4時47分