Chapter 4
Start-up and operation
13
4
Start-up and operation
To put the MBS UBR into operation and configure it, you need the following
hardware and software:
Power unit for the UBR
• Computer
• Installed web browser
• Installed PDF reader
• Network cable
The MBS UBR provides an integrated web server for configuration.
Chapter 4.2.1 describes the steps required to access the web server.
The user handbook is also available as a PDF file in the Help directory on the
web server. The handbook can be displayed and printed out as necessary
with a PDF reader.
Hardware installation
Assembly
The router has a mount at the rear for easy installation on top of hat rails
as per EN 60715. Install the router in the electrical cabinet and make sure
that there is sufficient ventilation to ensure the specified temperature range
(0…45 °C).
Electrical installation
Connect the MBS UBR to the green, two-pole port with a power supply as
per the technical specifications. An international power supply is optionally
available if required.
Summary of Contents for UBR-01 MK II
Page 57: ......