Plan the installation
Before unpacking your appliance, it is important to plan the installation and deployment.
Consider the following:
• How you need to prepare your site.
• Environmental requirements.
• Power requirements and considerations.
• Hardware specifications and requirements.
• Configuration scenarios.
• Preparing for installation.
Inappropriate use
The appliance is:
• Not a firewall.
You must use it within your organization behind a correctly configured firewall.
• Not a server for storing extra software and files.
Do not install any software on the appliance or add any extra files to it unless instructed by
the product documentation or your support representative. The appliance cannot handle all
types of traffic. If you use explicit proxy mode, only protocols that are to be scanned should
be sent to the appliance.
Operating conditions
10 to 35°C (50 to 95°F).
Temperature
20% to 80% (non-condensing) with a maximum humidity
gradient of 10% per hour.
Relative humidity
0.25 G at 3–200 Hz for 15 minutes.
Maximum vibration
One shock pulse in the positive z axis (one pulse on each
side of the unit) of 31 G for up to 2.6 ms.
Maximum shock
-16 to 3,048 m (-50 to 10,000 ft.).
Altitude
Positioning the appliance
Install the appliance so that you can control physical access to the unit and access the ports
and connections.
A rack-mounting kit is supplied with the appliance, allowing you to install the appliance in a
19-inch rack — see
Mounting the appliance in a rack
.
Pre-installation
Plan the installation
9
McAfee Email and Web Security Appliance 5.1 Installation Guide