143
Operation
5
Piton-Fixe (if equipped, according
to market)
To connect an implement/trailer, remove the spring clip
and pin (1) and lift the retaining hook (2).
Install the implement towing eye over the towing pin (3)
and lower the retaining hook (2).
Install the pin and spring clip (1).
IMPORTANT:
Maximum vertical load capacity
depends upon the capacity of the rear tyres fitted. Refer
to your Dealer for more information.
Piton Fixe rear sliding draft gear - Available
versions:
- EEC hook, not automatic
- EEC hook, automatic
- EEC hook, not automatic and EEC drawbar.
- EEC hook, not automatic and EEC drawbar.
- EEC Drawbar
Summary of Contents for X60 Series
Page 39: ...39 Controls Cab 3 Section 3 Controls Cab...
Page 61: ...61 Instruments and Programming 4 Section 4 Instruments and Programming...
Page 90: ...90 Instruments and Programming This page has been left blank intentionally...
Page 91: ...91 Operation 5 Section 5 Operation...
Page 151: ...149 Tyres Wheels Ballasting 6 Section 6 Tyres Wheels Ballasting...
Page 168: ...166 Tyres Wheels Ballasting This page has been left blank intentionally...
Page 169: ...167 Maintenance 7 Section 7 Maintenance...
Page 229: ...Electrical system 227 8 Section 8 Electrical system...
Page 242: ...Electrical system 240 Page left intentionally blankf...
Page 256: ...Technical specifications 254 This page has been left blank intentionally...
Page 262: ...260 Alphabetical index...