Special Operations - In Ditch
4 - 2
Clamp Carriage Assembly to Pipe
Position carriage assembly on side of the pipe. Lift pipe and slide
carriage assembly under pipe.
Rotate carriage assembly around to a normal upright position.
Attach the top jaws and loosely clamp around pipe.
TX00879-2-19-96
CD0019
3c
-2
-19-9
6
CD0019
4c
-2
-19-9
6
CD0019
5c
-2
-19-9
6
Make Fusion Joint
Refer to the "Butt Fusion Procedure" for operating instructions.
After facing operation, remove the facer from ditch.
TX00450-9-16-94
PH
03
88
9-
4-15-0
9
Summary of Contents for DynaMc 250HP
Page 44: ......