Operation
4 - 12
DataLogger Operation
DataLogger Fusion:
On this screen, the heating and fusion operations are completed. All the controls are available to control the heater and the fusion
carriage.
Å
Lower the heater to end of travel between the pipe ends. Ensure the heater is all the way down.
Å
Close the carriage under fusion pressure. Allow pipe to bead up according to the fusion standard. The stopwatch starts
automatically to track bead up time.
Å
Shift the pressure selector to heating pressure. Allow pressure to decrease to drag pressure.
Å
If heating pressure is not required, shift the carriage control valve to neutral position.
Å
Allow the pipe to soak according to the fusion standard.
Å
When the soak cycle is complete, touch the
Fusion Button
to complete the fusion. The
Fusion Button
will not appear until the
minimum soak time has elapsed per fusion standard.
Å
Allow the fusion joint to cool for the fusion standard cooling time.
Å
After the cooling has been completed, touch
Stop
at the bottom of the screen to end the logging of the fusion joint.
IMPORTANT:
If the joint needs to be aborted, press the
Stop
button.
Å
The Joint Report Summary screen will appear.
PH05
41
9-0
4-1
5-1
6