KP03 Mini Apartment Compactor
59
Copyright
©
7/2021 K-PAC
™
Compactors, a product of McLaughlin Family Companies
All Rights Reserved
SERVICE
PLC PROGRAMMING PROCEDURE
Inside the control panel is a PLC to control the compactor. The same control panel with PLC is used with all Power
Packs. Before shipment the PLC is setup to match the Power Pack with the compactor it ships with.
HOME MENU
- When the PLC is initially powered, the
is displayed on the PLC con-
trol screen. Notice the flashing date and time screen. To
navigate to the Main Menu to change timer and cycle set-
tings, press the ESC button
once. This will
take you to the Main Menu.
Figure 26
STOP MENU
- During normal operation, the top menu
line will read Stop
This indicates that the
program is running. To stop the program, use the naviga-
tion buttons
to place the cursor on the
Stop menu line and then press the OK button
.
Figure 27
All electrical work when installing and servicing must be
performed by a QUALIFIED PERSON.
QUALIFIED PERSON is one who has received training in and has
demonstrated skills and knowledge in the construction and operation of
electric equipment and installations and the hazards involved.
2
1
1
2
3