Optional Equipment
Rescue Hoist
CSP
−
902RFM207E
−
1
ROTORCRAFT FLIGHT MANUAL
MD900 (902 Configuration with PW 207E)
FAA Approved
Reissue 2
Original
10
−
38
PART IV
NORMAL PROCEDURES
Preflight checks:
To lower the work platform/steps, remove the quick release pin
on the hoist strut and move strut aside. The quick release pin must
be reinstalled before any load is placed on the hoist.
NOTE
:
External power is required for functional checks.
Rescue hoist assembly
CHECK
−
FOR OIL
LEAKS AND GENERAL
CONDITION
Hoist fairing
CONDITION AND
SECURITY
Electrical connections
CHECK
Hook assembly - freeness of swivel and latch
CHECK
Hoist support tube
CHECK MOUNTING
Hoist strut
CHECK MOUNTING AND
QUICK RELEASE PIN
Pendant control - electrical connection
CHECK
HOIST PWR and HOIST CUT circuit breakers
IN
Pilot's hoist control panel
CHECK SWITCH OFF
Electrical Master Panel
Power switch
BAT/EXT
Pilot's Hoist Control
Hoist arming switch
ON
Hoist armed light - on
CHECK
Payout displays
CHECK
Hoist operational check (pilot and operator)
CHECK
Do not restrict cable payout during this check. Fouling of the cable
on the drum will result if this precaution is not followed.
Reel out approximately 25 feet (8 meters) or more of
cable by using both the pendant and the pilot payout
controls. Do not exceed 15
°
cable deflection
OPERATE HOIST
CAUTION
CAUTION
Summary of Contents for MD900 Explorer
Page 4: ......