www.marketdirect.com.au
I
Ph: 1300 494 494
I
©Copyright
I
P a g e
|
31
Coupling
STEP 1
Push down the button (1) and push the locking mechanism back (2). When the locking mechanism (2) is
all the way back, release the button (1) locking the plate in place
STEP 2
Offer up the tow pin to the coupling making sure the tow pin cover is removed and there is no visible
debris on it. Locking plate should be in unlocked position as shown. Lower the coupling onto the tow pin.
Summary of Contents for XT16-HR East West
Page 45: ...www marketdirect com au IPh 1300 494 494 I Copyright I P a g e 43 ...
Page 54: ...www marketdirect com au IPh 1300 494 494 I Copyright I P a g e 52 Wiring Diagram Switch Panel ...
Page 72: ...www marketdirect com au IPh 1300 494 494 I Copyright I P a g e 70 Fig 1 ...
Page 86: ...www marketdirect com au IPh 1300 494 494 I Copyright I P a g e 84 Hub Assembly ...
Page 87: ...www marketdirect com au IPh 1300 494 494 I Copyright I P a g e 85 Trailing Arm Bushes ...
Page 113: ...www marketdirect com au IPh 1300 494 494 I Copyright I P a g e 111 ...