Page 78
Speed Level Seres - Servce & Parts Manual
January 2019
Secton 7 - Mechancal System
Hoses And Cables
Note:
Refer to Parts Section 15 for detailed hydraulic hose diagrams.
Inspect all hoses and electrical cables for security and damage. Hoses and cables should be
examined for rubbing and chafing.
Check all ties and clamps that keep hoses secure.
Check for leaks at fittings. Replace any damaged hose or cable.
Tag hoses for proper reassembly.
Disconnect hydraulic hoses. Immediately cap and plug all openings to prevent contamination.
Torque hose fittings according to the Hydraulic Torque Specification Table.
Platform Removal
Connect overhead crane or appropriate lifting device to
the platform.
Disconnect cables that go to the platform.
Remove the bolts that secure the platform to the boom
assembly.
Lift the platform away from the boom assembly.
Installation is reverse of removal.
1.
2.
3.
4.
5.
ART_3178
Lift Cylinder Removal And Installation
Note:
Refer to Section 5 for seal replacement instructions.
Refer to Parts Section 13 for detailed parts list and illustration.
CLEAN ALL FITTINGS BEFORE DISCONNECTING HOSES������
CYLINDERS ARE HEAVY������ PROVIDE PROPER SUPPORT BEFORE
REMOVING PINS������
ATTACH THE LIFTING DEVICE TO THE CYLINDER BODY������ LIFTING BY
EITHER END WILL CAUSE THE CYLINDER TO EXTEND������
Raise the platform.
Connect overhead crane by appropriate lifting device to the platform.
Tag wiring and hoses for proper reassembly.
Disconnect wires from the cylinder.
Disconnect hydraulic hoses. Immediately cap and plug all openings to prevent contamination.
1.
2.
3.
1.
2.
3.
4.
5.