Lifting and Tie Down
Lifting Operation
1) Refer to the Serial Number Tag, to make sure the Gross Vehicle Weight.
2) Place the boom in the stowed position.
3) Remove all loose items from the machine.
4) Properly adjust the rigging to prevent damage to the machine and so the machine remains
level.
If it becomes necessary to lift the machine using an overhead or mobile crane, it is very important
that the lifting devices are attached only to the designated lifting eyes. (See Figure
)
Lifting
Diagram
LIFTING EYES ARE PROVIDED AT THE FRONT AND REAR IN THE FRAME
SLAB. EACH OF THE FOUR CHAINS OR SLINGS USED FOR LIFTING
MACHINE MUST BE ADJUSTED INDIVIDUALLY SO MACHINE REMAINS
LEVEL WHEN ELEVATED.
Lifting Diagram
Lift Here
Lift Here
45-AJ Diesel
Transport & Lifting Instructions
Page
44
94533r1
–
December 2017