electromechanical operator for sliding gates
Nyota 115 evo
16
Pic. 3
Pic. 4
Pic. 5
CEMENTING THE ANCHOR BRACKET
MOUNTING NYOTA 115 EVO ONTO THE ANCHOR BRACKET
Inspectable
junction
pit
Pipes for
the electric
cables
Anchor bracket
to be cemented
into a ground
foundation
80
70
Distances in Pic. 3 are to be followed in this step. Once satis ed that concrete has rmly set all around the the bracket,
Nyota 115 evo can be mounted onto it.
Cover removing: unscrew the fastening screw completely (Pic. 4), then pull at the bottom in order to remove the cover.
Before fastening Nyota 115 evo by the provided screws, insert the washers under the operator: they will be removed once the
gear rack has been installed. In this way a 2 mm clearance is obtained between the rack teeth and the operator pinion (Pic. 5).
!
!
Washers
to be used as
distance parts
in installing phase
M8 fastening
screw
Cover
fastening
screw
M8 nut