AP-1301 i/t
Operator’s Guide
Document Revision: 100102
Page 32
Running Jobs
Within the
Running Jobs
pane, there are 6 fields:
JobID
•
This is the JOBID of the active job.
Total
•
Represents the desired number of discs to print.
Good
•
Represents the number of discs successfully completed.
Bad
•
Represents the number of discs that have failed to print correctly. If this
number is high, you may need to readjust the alignment of the printer on
the deck of the AP-1301.
Started
•
Represents the time your job was submitted.
Status
•
The Status field shows you what is happening to your job as it is being
processed. This will typically read printing, or loading.
Completed Jobs
Within
Completed Jobs
there are many of the same fields discussed earlier
in this section. The
Completed
field is the only new field. This field
displays the time at which the job was completed.
Summary of Contents for AP 1301
Page 1: ...AP 1301 Operator s Guide...