51
SolarBee Installation
1. Locate Staging & Deployment Area
The first step to installing the SolarBee into
a water body is finding a good location to,
1) unload major components, 2) lowering
SolarBee into the water, and 3) towing into
position from
The following considerations should be made
when choosing a staging and deployment
area:
• Crane or Hoist Equipment Access to Water
• 2 ft (60cm) Water Depth within Crane/Hoist
Reach
• Close proximity to SolarBee locations
• 20 ft X 20 ft (6 m X 6 m) Assembly Space
per SolarBee Unit.