Installation guide solar modules
V1 – April 2015
12 - 19
Mounting of grounding terminal on frame
The grounding terminal must be placed on the frame in such a way
that the screw touches the grounding hole. Using a screwdriver,
install the screw into the grounding hole until its head is flush with
the base and the base is flush with the frame.
Then, turn the screw another quarter or half turn.
The thread-cutting screw should be torqued by 20.4 lb in and 24,8
lb in (2.3 and 2.8 Nm).
Ground wire placement
Insert the cable into the wire slot. Then push in the wire on both
ends into the slot. (The wire slot will cause the wire to be slightly
curved as shown.)
The slider must be engaged (slider covers the base). Using cable
clamps, move the slider over the base until it covers the base. This
terminates the wire. To open the slider a slotted screwdriver can be
used.
Summary of Contents for MBA-GG60 BiSoN Series
Page 2: ......
Page 4: ...Installation guide solar modules V1 April 2015 4 19...