Installation guide solar modules
V1 – April 2015
15 - 19
o
Firmly clamp and hold the entire perimeter of the module, on both the front and back of the
module.
o
The module shall be fully supported by at least 10mm from the edge on all sides of the module.
o
Any shading or covering of the cells on both sides in the module must be avoided
5.4
Clamping areas and maximum load applicable
Note:
Pay attention to the maximum load-bearing capacity of the modules, with consideration of wind and snow
load zones, the terrain category and the height of the building.
6.
ELECTRICAL INSTALLATION
Do not connect or disconnect modules under load! Danger! Risk of serious injury or death from electric
shock or electric arc flash.
The solar modules are designed for use in PV systems of application class A and are approved for operation
in systems with dangerous direct current (more than 120 V DC in accordance with EN 61730) and power. PV
modules of this application class are approved for operation in installations with unrestricted access.
BiSon series modules from MegaCell, which are qualified under EN 61730 and have been properly installed,
meet the requirements of protection class II.
Summary of Contents for MBA-GG60 BiSoN Series
Page 2: ......
Page 4: ...Installation guide solar modules V1 April 2015 4 19...