6.1

 

Electrical Connections 

Never open the connection box! The modules are already fitted with all necessary wires and connectors. 

 

 
 
CAUTION: 

 

System design should consider the potential increased power output (Pmax) and current (Isc) due to the 

modules  bifacial  abilities.  Additional  power  and  currents  beyond  the  STC  rating  are  possible.  See  the 

Electrical Specifications on the data sheet for electrical parameters in presence of albedo. All protections, 

wiring,  equipment  ratings,  and  inverters  should  be  sized  accordingly  o  the  product  ratings,  maximum 

expected output and required protection factors. 

 

6.2

 

Ensure correct wiring: 

o

 

Only  connect  modules  with  the  same  rated  current  in  series  and  modules  with  the  same  rated 

voltage in parallel.  

o

 

The modules may only be operated at the allowable system voltage; operation at a higher voltage 

is not recommended. 

o

 

The integrated connection cables are UV resistant. The conductor cross-section of the connection 

cables is 4 mm².  

o

 

For  wiring,  the  connection  cables  are  fitted  with  prefabricated  connectors,  which  are  protected 

against reverse polarity.  

o

 

Keep the total area of all conductor loops as low as possible in order to reduce the voltages due to 

indirect lightning strikes.  

o

 

Always  carry  out  a  careful  final  check  of  the  wiring  prior  to  commissioning  the  generator.  If  the 

measured open circuit voltage diverges from the default value, a wiring error has occurred. Check 

for correct polarity.  

o

 

Merge  the  connectors  together  correctly:  connectors  may  only  merged  together  when  dry.  Also 

make  sure  that  a  gap-free  connection  is  possible  and  to  respect  maximum  system  voltage 

calculated at the expected lower operating temperature  

o

 

When  connecting  the  modules  in  parallel,  a  corresponding  overcurrent  protection  must  be  used. 

This can be achieved with direct current fuses, which prohibit return currents greater than 15 A. 

o

 

Furthermore,  the  connection  requirements  and  design  regulations  of  the  inverter  manufacturer 

must be observed. 

o

 

With multi rows structure, connect horizontal series of modules to different MPPT to reduce losses 

due to mismatch on reflected light on back side    

 

6.3

 

Only use suitable materials: 

The system may only be wired using special solar wires and suitable connectors. It is very important that all 

necessary  materials  are  in  a  flawless  electrical  and  mechanical  condition.  Only  use  single  core  wires  and 

Summary of Contents for MBA-GG60 BiSoN Series

Page 1: ...Document name MCELL_PV_Modules_Installation_Manual_EN_v1 2_20150715 Revision date V1 2 July 2015 www megacell it SAFETY AND INSTALLATION MANUAL BIFACIAL SOLAR MODULES...

Page 2: ......

Page 3: ...allowable maximum mechanical loading 10 4 4 Make sure that the surroundings are suitable 10 4 5 The correct location for installation 10 4 6 Yield maintenance through optimal alignment and inclination...

Page 4: ...Installation guide solar modules V1 April 2015 4 19...

Page 5: ...Installation guide solar modules V1 April 2015 5 19 1 MODULES 1 1 MBF GG60 BiSoN series with frame 1 2 MBA GG60 BiSoN series frameless...

Page 6: ...oduct are beyond company control MegaCell does not assume responsibility and expressly disclaims liability for loss damage or expense resulting from improper installation handling or use The informati...

Page 7: ...d after installation to calculate correctly inverter cables and connection size Serial number Each individual module is identified by a unique serial number accompanied with a barcode They are permane...

Page 8: ...r modules generate electricity When exposed to light a voltage occurs which can be dangerous and life threatening Even though the individual modules generate a relatively low voltage of 50 V DC the vo...

Page 9: ...and safe unpacking Please refers to the instructions printed on the cartoon box of each pallet The modules are sensitive technical components which must be handled with utmost care Therefore be partic...

Page 10: ...re that after installation the module is neither subjected to artificially concentrated sunlight immersed in water or continuously splashed with liquids By all means make sure that the module is not s...

Page 11: ...f the module frame if present is not required for fault free operation To reduce the risk of electric shock e g due to static charge as far as possible MegaCell recommends to ask an experienced instal...

Page 12: ...ith the frame Then turn the screw another quarter or half turn The thread cutting screw should be torqued by 20 4 lb in and 24 8 lb in 2 3 and 2 8 Nm Ground wire placement Insert the cable into the wi...

Page 13: ...hould not be mounted in such a way that the drain holes of the module can become blocked MegaCell PV modules are suitable for mechanical mounting both in portrait and landscape orientation In choosing...

Page 14: ...will render the product and performance warranty void 5 2 Frameless modules The use of frameless MegaCell modules requires frameless mounting system that grabs the edge of the module with a pressure...

Page 15: ...snow load zones the terrain category and the height of the building 6 ELECTRICAL INSTALLATION Do not connect or disconnect modules under load Danger Risk of serious injury or death from electric shock...

Page 16: ...ed against reverse polarity o Keep the total area of all conductor loops as low as possible in order to reduce the voltages due to indirect lightning strikes o Always carry out a careful final check o...

Page 17: ...LES MegaCell recommends to inspect the installation on a regular basis with following minimum maintenance o Check the electrical and mechanical connections to verify that they are clean secure and und...

Page 18: ...sual appearance of the module surface and result in decreased performance o Use of automatic cleaning machines for solar energy systems is at your own risk and is not authorized by MegaCell in any way...

Page 19: ...Document name MCELL_PV_Modules_Installation_Manual_EN_v1 2_20150715 Revision date V1 2 July 2015 www megacell it MegaCell S r l a socio unico A coordinated company part of Mega Group S r l Registered...

Reviews: