∼
20
Setting the data-logging interval.
1.
While log is being displayed, press the
key.
Int
will appear on the display.
2.
Press the key to see the value of the
logging interval (in seconds)
3.
Set the interval in 10 second steps with the
and keys (max. value 1990 seconds,
min. value 10 seconds)
4.
Press the key to accept the new value,
or the
EXIT
button to quit.
5.
Press the
EXIT
button again to escape from
the logging setup screens. The display will
show
rcl
.
Using the Megger SP6F Switched Probe
Operation
The
Megger SP6F
is an accessory for designated
Megger installation test instruments. When fitted in
the specially designed connector, in place of the
existing ‘Low’ lead, the SP6F acts as a remote test
button to operate the instrument and as a ‘Low’
probe. This simplifies instrument control and two-
handed probing. The SP6F is suitable for use with
Megger insulation test instruments up to 1kV
output test voltage.
Safety
Meets the safety requirements for double
insulation to IEC1010-2-031 (1995), EN61010-2-
031 (1995), IEC 1010-1 (1995), EN61010-1 (1995)
Category III* 300 V phase to earth and 500V phase
to phase. The probe is fitted with an internal, non-
replaceable fuse, to protect the user should the
probe be used accidentally in conjunction with a
testlead in the low terminal.
*Relates to transient overvoltage likely to be found
in fixed installation wiring.
Do not use the probe if any part of it is
damaged.
Battery Replacement
When the low battery symbol appears, the cells
are nearly exhausted and should be replaced as
soon as possible. Use Alkaline cells IEC LR6 (AA)
or NiCd rechargeable. To install or replace the
cells, disconnect the test leads, switch the
instrument to
OFF
and loosen the captive screws
on the rear of the battery compartment. Remove
the cover and disconnect the battery holder from
the battery leads. Ensure that the replacement