M
AVTMMIT30-EN Rev E02 June 2009
4
WARNING
Never connect the test set to
energized equipment or use the
test set in an explosive
atmosphere.
All apparatus to be tested should be bonded to
ground except during the actual test. Test
connections should be made with the ground
bonds in place.
NOTE: Please note that even isolated conductors may
develop static charge due to nearby electrical
fields.
At the completion of a test, after the power
source has been shut down and the test set kV
meter reads zero, all energized parts of the test
setup MUST be short circuited by means of a
safety grounding/discharge rod or “hot stick.”
Ground bonds should then be applied to the
equipment that was tested. These should be left in
place until access to the equipment is again
required.
If the test set is operated in accordance with the
safety precautions noted above and if all grounds
are correctly made, rubber gloves are not
necessary. That being so stated, please observe all
governmental, local, work regulations as
applicable with regard to operating or working in
proximity to high voltage electrical energy. Ensure
the use of all PPE (Personal Protective
Summary of Contents for MIT30
Page 2: ......
Page 3: ...30kV DC Insulation Tester MIT30 Catalog No MIT30 Instruction Manual...
Page 6: ...AVTMMIT30 EN Rev E02 June 2009 ii M...
Page 12: ...M AVTMMIT30 EN Rev E02 June 2009 6 M...
Page 14: ...M AVTMMIT30 EN Rev E02 June 2009 8 M...
Page 20: ...M AVTMMIT30 EN Rev E02 June 2009 14 M...
Page 24: ...M AVTMMIT30 EN Rev E02 June 2009 18 M...
Page 34: ...M AVTMMIT30 EN Rev E02 June 2009 28 M...
Page 37: ...OPERATION TROUBLESHOOTING AVTMMIT30 EN Rev E02 June 2009 31 Troubleshooting Chart Figure 1...
Page 38: ...M AVTMMIT30 EN Rev E02 June 2009 32 M...
Page 40: ...M AVTMMIT30 EN Rev E02 June 2009 34 Figure 2...
Page 41: ...NOMENCLATURE AVTMMIT30 EN Rev E02 June 2009 35 This page intentionally left blank...
Page 43: ...NOMENCLATURE AVTMMIT30 EN Rev E02 June 2009 37 Figure 4...