7
OPERATION
When the test set and apparatus to be tested are
set up as indicated in Section 6, the equipment
can be energized and the required tests run by
following the steps given below.
Note:
Before operating the test set, read Section 2 of
this manual and ensure that all appropriate
safety precautions are observed.
TEST PROCEDURE
1.
Complete connection procedure as outlined in
Section 6.
2.
Remove all safety grounds from the apparatus
to be tested
3.
Close the mains switch, the power indicator
will illuminate.
4.
Set the overcurrent trip to the desired trip
level.
5.
Set the ionization volume to the desired level.
Summary of Contents for MIT30
Page 2: ......
Page 3: ...30kV DC Insulation Tester MIT30 Catalog No MIT30 Instruction Manual...
Page 6: ...AVTMMIT30 EN Rev E02 June 2009 ii M...
Page 12: ...M AVTMMIT30 EN Rev E02 June 2009 6 M...
Page 14: ...M AVTMMIT30 EN Rev E02 June 2009 8 M...
Page 20: ...M AVTMMIT30 EN Rev E02 June 2009 14 M...
Page 24: ...M AVTMMIT30 EN Rev E02 June 2009 18 M...
Page 34: ...M AVTMMIT30 EN Rev E02 June 2009 28 M...
Page 37: ...OPERATION TROUBLESHOOTING AVTMMIT30 EN Rev E02 June 2009 31 Troubleshooting Chart Figure 1...
Page 38: ...M AVTMMIT30 EN Rev E02 June 2009 32 M...
Page 40: ...M AVTMMIT30 EN Rev E02 June 2009 34 Figure 2...
Page 41: ...NOMENCLATURE AVTMMIT30 EN Rev E02 June 2009 35 This page intentionally left blank...
Page 43: ...NOMENCLATURE AVTMMIT30 EN Rev E02 June 2009 37 Figure 4...