ROUTINE MAINTENCE
AVTMMIT30-EN Rev E02 June 2009
25
clip should be smooth and clean. If the
unjacketed portion of the HV cable is dusty,
wipe it down with a clean dry lint free cloth.
9.
Check that all knobs rotate smoothly
throughout their entire range, that all knobs
are firmly affixed, and in serviceable condition
with no cracks. Pay special attention to the
HV voltage control knob with its locking
feature. Ensure that the lock engages and
disengages smoothly.
CALIBRATION PROCEDURE
REQUIRED EQUIPMENT
30 kV range voltmeter, 0.5% F.S. accuracy,
NIST traceable
300 µA ammeter, 0.5% F.S. accuracy,
NIST traceable
100 M
Ω
(+/- 30%),
≥
15W,
≥
30 kV test load
VOLTMETER CALIBRATION
1.
Read and fully understand instruction manual.
2.
Remove top panel screws.
3.
Separate top panel from chassis. Refer to
Figures 5A and 5B.
Summary of Contents for MIT30
Page 2: ......
Page 3: ...30kV DC Insulation Tester MIT30 Catalog No MIT30 Instruction Manual...
Page 6: ...AVTMMIT30 EN Rev E02 June 2009 ii M...
Page 12: ...M AVTMMIT30 EN Rev E02 June 2009 6 M...
Page 14: ...M AVTMMIT30 EN Rev E02 June 2009 8 M...
Page 20: ...M AVTMMIT30 EN Rev E02 June 2009 14 M...
Page 24: ...M AVTMMIT30 EN Rev E02 June 2009 18 M...
Page 34: ...M AVTMMIT30 EN Rev E02 June 2009 28 M...
Page 37: ...OPERATION TROUBLESHOOTING AVTMMIT30 EN Rev E02 June 2009 31 Troubleshooting Chart Figure 1...
Page 38: ...M AVTMMIT30 EN Rev E02 June 2009 32 M...
Page 40: ...M AVTMMIT30 EN Rev E02 June 2009 34 Figure 2...
Page 41: ...NOMENCLATURE AVTMMIT30 EN Rev E02 June 2009 35 This page intentionally left blank...
Page 43: ...NOMENCLATURE AVTMMIT30 EN Rev E02 June 2009 37 Figure 4...