AVTMTTR20 Rev 4 Dec 2015
41
Appendix C
Connections and Vector Voltage Diagrams
Table C-1 and C-2 show winding diagrams for standard transformers and
nonstandard transformers for power and distribution transformers marked in
accordance with the ANSI standard.
To make a measurement on a three-phase power transformer with TTR20 test
set, match the vector diagram from the transformer nameplate to the
corresponding winding connection diagram from Table C-2. Then connect the
TTR20 test leads to the appropriate transformer winding terminals of phase A.
Put an external jumper, if required. After phase A test is complete, reconnect the
test leads to phase B. Put an external jumper, if required. After phase B test is
complete, reconnect the test leads to phase C. Put an external jumper, if
required. Compare the measured test results to the calculated turns ratios.
NOTE. Three phase transformer may be tested in any order. For example, phase
C, then phase A, and then phase B turns ratio may be tested.
The tables show the windings tested for each of the three phases. The tables
also show the relationship between the measured turn ratio and the actual line-
to-line voltage ratio. For the ANSI specification, the rated voltage on the
high-voltage winding is represented by V
H
; V
X
represents rated voltage on the
low-voltage winding.
Summary of Contents for TTR20
Page 2: ......
Page 3: ...TTR20 and TTR20 1 Handheld TTR Transformer Turn Ratio Test Set Instruction Manual ...
Page 8: ......
Page 14: ...M AVTMTTR20 Rev 4 Dec 2015 6 M ...
Page 34: ...M AVTMTTR20 Rev 4 Dec 2015 26 M ...
Page 42: ...M AVTMTTR20 Rev 4 Dec 2015 34 M ...
Page 46: ...M AVTMTTR20 Rev 4 Dec 2015 38 M ...