WasteStar installation operating instructions FC
9670512
Design and construction subject to change without prior notice!
Page
33
of
40
14
Staff training
Only trained and instructed personnel are allowed to work on the tray stacker.
Staff responsibilities must be clearly defined in terms of operation, maintenance
and repairs.
Any personnel undergoing training are only allowed to work on the installation un-
der the supervision of an experienced person.
Persons
Trained operat-
ing personnel
Authorised trained
persons
Authorised Ser-
vice technician
Activity
Installation and assembly
Commissioning
Operation, use
Cleaning
Check safety fittings
Troubleshooting
Troubleshooting, me-
chanical
Troubleshooting, electri-
cal
*
Maintenance
Repair works
*
trained electrician.
The instructions must be acknowledged in writing.
15
Maintenance, servicing
We recommend you conclude a maintenance contract with our agency to guaran-
tee a long service life of the system.
Observe the maintenance intervals prescribed in the operating instructions!
Observe the maintenance instructions for the individual components!
A functional test on all safety systems of the installation is carried out during every
regular maintenance.
Carefully dispose of any cleaning products that could harm the environment!
Summary of Contents for WasteStar FC
Page 40: ......