WasteStar installation operating instructions FC
9670512
Design and construction subject to change without prior notice!
Page
16
of
40
6
Delivery, transport, installation and assembly
6.1
Delivery
NOTE
Check that the delivery is complete immediately after receiving it by comparing it to
MEIKO’s contract confirmation and/or the delivery note.
If necessary, complain about any missing parts immediately to the shipping company
and notify MEIKO.
Check the entire installation for any damage that may have occurred during shipping.
In the event of any transport damage, please inform MEIKO immediately in writing,
and also send a photo of the damaged parts to us.
6.2
Transport and installation
WARNING
Risk of injury caused by heavy loads!
In order to avoid damaging the system and causing serious injury during transport,
the transport procedures must be carried out by qualified personnel only and in ac-
cordance with the safety precautions.
Read the chapter "General safety instructions".
•
The installation must only be
transported on the supplied
wooden frame. The packing is
specifically designed to allow the
appliances to be moved safely
and securely using a pallet jack or
a sack truck .
•
For safe transport, the installation is supported by a special square-timber
frame.
•
Observe transport instructions on the packing.
•
Handle with care.
•
Unpack the installation.
6.2.1 Installation and assembly
The system must be installed as per the information in the installation drawing. It
m u s t
be installed by a licensed and authorised technician.
We decline any responsibility for damages caused by incompetent connections.
System installation steps:
The complete unit must be levelled in both directions using a water level.
Compensate for an uneven floor by adjusting the feet.
Table joints must be sealed with detergent-resistant sealing compound (e.g. sili-
cone).