4.3 Security during Installation
WARNING!
Preparing for Commissioning
This built-in unit, has been designed and examined according to the requirements of the standard
IEC 62368-1 "Audio/video, information and communication technology equipment - Part 1:
Safety requirements".
When the built-in unit is used in a terminal (e.g., housing cabinet), additional requirements
according to Standard IEC 62368-1 must be observed and complied with. In particular, the general
requirements and the safety of electrical equipment (such as IEC, VDE, DIN, ANSI) as well as the
applicable national standards are to be observed.
The device has been developed for use in the industrial sector as well as in residential areas and
can only be used in such environments. For environments with higher levels of soiling, additional
measures, e.g. Installation in an air-conditioned control cabinet required.
Transport, Unpacking, Installation
If the unit is brought into the operating room from a cold environment, condensation may occur,
wait until the unit is temperature-controlled and absolutely dry before operating it.
When unpacking, setting up, and before operating the equipment, be sure to read the information on
the hardware installation and the specifications of the equipment. These include, for example,
dimensions, electrical characteristics, and necessary ambient and climatic conditions, etc.
The fire protection must be ensured in the installed state.
For mounting, the housing must not be damaged. No holes may be drilled in the housing.
For safety reasons, the device with the highest mass should be installed in the lowest position of
the rack. Other devices must be placed from the bottom to the top.
The device must be protected against mechanical stress such as vibration or shock.