ISLAND HOOD ASSEMBLY
Please follow below instructions.
Installation of ceiling connection plate :
Front sticker (figure 3) on ceiling connection
plate and control panel of chimney hood should
have the same direction.
1)Drill 10mm holes from A,B,C,D points.
2)Drive 10mm wall plugs in to A,B,C,D holes.
3)Fix ceiling connection plate to ceiling by using
4 screws (5,5 x 45).Wall plugs,screws and celing
connection plate are given with chimney hood.
Picture 3
A
B
C
D
FRONT
ceiling
connection plate
Hanging
hole
Front bracket connection,
left and right up front
Back bracket connection,
up-front
FRONT
Assembly
bracket
Assemblying
front surface of
body
Installation of chimneys to motor cabinet:
Please put internal chimney in extarnal
chimney.For temporary connection between
chimneys please use a screw on motor
cabinet.(So chimneys won't drop while you
install motor cabinet to ceiling connection
plate.)Mount the chimneys on this
screw.(Screw holes of internal chimney should
befit the side of motor cabinet.) Figure 5
Installation of cornerpieces:
Front sticker(picture 4) shows where front side
of chimney hood should be installed.Front
cornerpieces should be left and right
directions.Back cornerpieces should be
extroverted.Screw 4 cornerpieces to motor
block.Hanging bar should have same directions
with ceiling connection plate.Regulating the
legth of chimney hood with these cornerpieces.
Figure 4
Figure 3
Figure 4
Figure 5
-20-