4 Commissioning
12
4 Commissioning
See also “Installation and Set-up”.
Video tutorial
Requirements of the installation location
CAUTION
Failure to comply with the set-up conditions can result in injuries, malfunctions and/or
damage to the device.
n
Comply with all the specifications of this chapter for initial commissioning.
u
The device is not suitable for operation in explosive atmospheres.
u
The device is only intended for use in interior spaces.
u
The device is conceived for use outside the patient area. The device should be located a minimum of
1.5 m radius away from the treatment area.
u
Install the device in a dry and dust-protected location.
u
Maintain sufficient clearance to the surrounding surfaces in order to ensure sufficient ventilation.
u
Ensure that the sealing device is located away from direct sunshine and outside the range of other
sources of heat.
u
Set-up the device protected against blows or vibrations.
Space requirements
Fig. 1: View from the front and right
Dimensions
MELAseal 200
Width
A
36.5 cm
Width including lever
A
1
41.5 cm
Height
B
15 cm
Minimum clearance above
B
1
25 cm
Minimum clearance to the side
C
10 cm
Minimum clearance to rear
C
1
8 cm
Depth
D
24 cm
When using film rolls, additional space is required for a roll dispenser e.g. the “standard” or “Deluxe”
models.