140 of 271
b. Loosen the front M4x6mm cap head socket screw mounting the upper trap assembly to the
needlecase.
Figure 3 - Upper Trap Assembly Hex Nut
c. Loosen the two M4 hex nuts located at the bottom of the right side of the needlecase.
d. Move the grabber blade back in between the upper and lower trap assemblies.
e. Tighten the front screw mounting the upper trap arm to the front of the needlecase to the
torque specifications.
f. Tighten the two M4 hex nuts on the bottom right side of the needlecase to the torque spec-
ifications. Make sure the grabber blade is engaged evenly from needle 1 to needle 16 before
tightening down the nut.
g. Tighten the four M3x6mm button head screws that mount the lower trap assembly to the
upper trap assembly to the torque specifications.
h. Move the grabber blade back out of the needle case to it’s full extended position.
i. Move the grabber blade in and out of the upper and lower trap assembly several times. It
should just brush against the grabber trap velcro on the upper trap and be parallel all the way
across.
j. Visually check the position of the grabber blade at the fully extended position. A vertical line
extending down from the inside edge of the grabber blade should be 9.9mm±0.3mm from a
vertical line extending down the front of the nearest needle bar. If this adjustment is not cor-
rect, contact technical support for instructions.
6. Turn on the machine.
Table of Contents