186 of 271
17. Install the remaining covers in the reverse order that you removed them and tighten the screws to
the torque specifications.
18. Turn the machine ON and verify that the LEDs come on in the left LED cluster assembly.
Right LED Cluster Assembly:
1. Turn the machine ON.
2. Color change to Needle 1.
3. Turn the machine OFF.
CAUTION!!
Use extreme care not to drop metallic objects, tools, or other conductive material
on the Main PCB when you have the base cover removed. If you drop such objects on the Main
PCB, it can severely damaged the electronics which will be very expensive to repair.
4. Remove the right upper arm front cover, right upper arm cover and the base cover.
Figure 6 - Right LED Cluster Harness
5. Disconnect the LED cluster harness from the left LED cluster assembly.
6. From the back side of the right upper arm, pull the harness through the access hole located just
above the x-cable clamp (Figure 5).
7. Pull the harness through the right access hole to the back of the machine, removing any twist-lock
cable ties that tie it to the adjacent harnesses and pull it through the right lower arm access hole.
8. Remove the EMI Cover from the main control board.
9. Remove the right LED cluster harness from adjacent harnesses and disconnect the right LED clus-
ter harness from the Main PCB at connector location J10.
10. Connect the new LED cluster harness to the right LED cluster assembly and run it the right upper
arm access hole to the back of the machine to the right lower arm access hole.
11. Run the LED cluster harness through the right lower arm access hole to around the left inside pe-
rimeter of the base and connect it to the Main PCB at connector location J10.
Table of Contents