190 of 271
12. Run the harness to the left and then straight up and tie it at the top of the needlecase where the
grabber motor harness is bundled. Pinch the harness with your finger to give it a 90 ° bend as
shown in Figure 4 above.
13. Use a twist-lock cable tie to tie the thread break harness to the harnesses above the grabber step-
per motor and run the other end of the harness under the thread tree base and pull it out from
the back.
14. Use twist-lock cable ties and bundle the thread break harness to adjacent harnesses in front of the
thread tree base.
15. Tie the harnesses together behind the thread tree base and route the thread break harness with
the adjacent harnesses to the right into the right wiring channel and tie them together where they
meet the harnesses in the channel.
16. Run the thread break harness down the wiring channel following the path of adjacent harnesses
down to the Main PCB and connect it at the connector socket at location J29 on the Main PCB.
17. Replace the EMI cover carefully.
18. Reinstall the covers in the reverse order that you removed them.
19. Run a short functional test to verify that the thread break harness works. (No error message
generated by the software indicating a communication break with the thread break sensor PCB.)
Deliberately cut the thread where it runs into the thread feeder to see if the thread break sensor
PCB detects a thread break.
20. Run the thread break sew test (AMTBTESTXXX) on the machine.
Table of Contents