266 of 271
Adjustment
Current procedures require the use of a fixture to adjust the cam follower preload. This requires that the
color change housing assembly be removed and shipped to the factory for repair.
If the cam follower preload is out of specification, contact Technical Support for instructions.
Pull Force on Take-Up Lever
Measurement
1. Ensure that the take-up lever of the current needle is at full “head-up” position.
Figure 1: Measurement of Take-Up Lever Pull Force
2. Using a force gauge (PN: 995591-01), measure the amount of pull force it takes to lift the take
up lever up to a point just before it hits a hard stop. Do not allow the take-up lever to hit the hard
stop or the measurement will be inaccurate.
Adjustment
If the measurement is not between 1.4 to 1.5 lbs, readjust the preload on the take-up lever spring.
Color Change Lead Screw
Measurement
1. The straightness of the color change lead screw cannot exceed 0.010” [0.25mm] at any point of
the
threaded section.
2. Measure the straightness by placing a straight edge against the color change screw and measur-
ing the gaps between the straight edge and the screw.
Table of Contents