50 of 271
e. When the x-cable is roughly at the lower edge of the cut-out on the right side of the ten-
sion gauge, remove the wrench, pliers and the tension gauge.
f. Remove the tools and the x-cable tension gauge before proceeding.
g. Move the X-Beam full travel to the front and back and the X-Carriage full travel left and
right a few times to ensure proper settling of the X-Cable tension.
h. Test the tension again.
25. Remove the x-cable tension gauge before proceeding.
WARNING!!
If you proceed without removing the x-cable tension gauge, damage to your ma-
chine will occur and a service call will be necessary.
•
Note: will not be responsible for any damage to the machine or related service costs caused by
not removing the tension gauge.
26. Position the right side cover in its original location on the machine as shown in the image.
27. Loosely install one (1) of the rear (shorter) mounting screws to hold the cover in place.
28. Install the other two (2) mounting screws. The longer of the screws secures the front. The shorter
of the screws secures the rear.
29. Carefully tighten all three (3) screws only enough to secure the cover in place. Over-tightening of
the screws may result in cosmetic damage to or cracking of the cover.
30. If the x-cable is not positioned near the lower edge of the cut-out on the right side of the x-cable
tension gauge as shown in the image, the tension is out of specification and needs adjustment. If
this is the case, press on the out of specification button to continue.
31. Locate the grabber eccentric on the upper left back side of the needlecase as shown in the image.
Table of Contents