DISASSEMBLY INSTRUCTIONS
B3-2
Traverse Holder
Insulator (F)
Main Chassis Ass'y
Insulator (F)
Insulator (R)
NOTE
1.
2.
3.
In case of the Pulley Motor installation, check if the
value of the Fig. 3-3-B is correct.
When installing the Loading Motor PCB Ass'y, install it
correctly as Fig. 3-3-C.
In case of the Loading Motor PCB Ass'y installation,
hook the wire on the Main Frame Ass'y as shown Fig.
3-3-C.
Fig. 3-3-B
7.0
±
0.1mm
Safety surface for pressing
of the insert.
Loading Motor
Pulley Motor
Fig. 3-3-C
Rack Loading
A
B
The Lever should be position
between A and B.
Check Hook
Rack Loading
1
Main Frame Ass’y
Main Gear
3-4: RACK LOADING/MAIN GEAR/PULLEY GEAR
(Refer to Fig. 3-4-A)
1.
2.
3.
Press down the catcher
1
and slide the Rack Loading.
Unlock the support
2
and remove the Pulley Gear.
Remove the Main Gear.
Pulley Gear
2
Fig. 3-4-A
3-5: CLAMPER ASS'Y (Refer to Fig. 3-5-A)
Press the Clamper and rotate the Clamper Plate
clockwise, then unlock the 3 supports
1
.
Remove the Clamper Plate, Clamper Magnet and
Clamper.
1.
2.
Clamper Plate
Clamper Magnet
Fig. 3-5-A
Fig. 3-4-B
NOTE
1. In case of the Rack Loading installation, do not mesh it
to the Main Gear as shown the Fig. 3-4-B.
Check Hook
Main Gear
Rack Loading
Main Frame
Clamper
1
1
1
NOTE
1. In case of the Clamper Ass'y installation, install
correctly as Fig. 3-5-B.
Fig. 3-5-B
No gap
Clamper Plate
Clamper
3-6:
Remove the Traverse Holder.
Remove the 2 Insulator (F).
Remove the Insulator (R).
1.
2.
3.
Fig. 3-6-A
TRAVERSE HOLDER/INSULATOR (F)/INSULATOR
(R) (Refer to Fig. 3-6-A)
NOTE
1.
2.
In case of the Insulator (F) installation, install correctly
as Fig. 3-6-B.
In case of the Insulator (R) installation, install correctly
as Fig. 3-6-C.
Fig. 3-6-B
Traverse Holder
Insulator (F)
Loading Motor PCB Ass’y