DISASSEMBLY INSTRUCTIONS
1. REMOVAL OF MECHANICAL PARTS
AND P.C. BOARDS
1-1: TOP CABINET, FRONT CABINET AND
OPERATION PCB (Refer to Fig. 1-1)
1.
2.
3.
4.
5.
6.
Remove the 4 screws
1
.
Remove the Top Cabinet in the direction of arrow (A).
Disconnect the following connector: (CP651).
Unlock the 7 supports
2
.
Remove the Front Cabinet in the direction of arrow (B).
Remove the 4 screws
3
and remove the Operation PCB.
1-3: DECK CHASSIS (Refer to Fig. 1-3)
Remove the 3 screws
1
.
Remove the screw
2
.
Disconnect the following connectors: (CP1001, CP1002,
CP1003, CP4001, CP4002 and CP4003).
Remove the Deck Chassis in the direction of arrow.
1.
2.
3.
4.
Bottom Plate
Deck Chassis
Fig. 1-1
1-2: FLAP (Refer to Fig. 1-2)
1.
2.
Open Flap to 90˚ and flex in direction of arrow (A), at
the same time slide in direction of arrow (B).
Then lift in direction of arrow (C).
(A)
(C)
(B)
Flap
Fig. 1-2
1-4: SYSCON PCB AND JACK PLATE (Refer to Fig. 1-4)
Remove the screw
1
.
Remove the Syscon PCB in the direction of arrow (A).
Unlock the 2 supports
2
.
Remove the Jack Plate in the direction of arrow (B).
1.
2.
3.
4.
Fig. 1-3
1
Top Cabinet
3
1
1
1
(A)
Front Cabinet
(B)
3
3
3
Operation PCB
2
2
2
2
2
2
2
1
2
1
1
B1-1
Fig. 1-4
Syscon PCB
(A)
Jack Plate
(B)
Bottom Plate
2
2
1