SDM-9600 with SDM-9606 Blades Hardware Installation Guide
4-16
Memotec Inc.
6.
Connect the strip terminations of the harness wires to the -48 volt DC power supply.
7.
Reinstall the clear plastic protector, ensuring that the harness wires come through the
hole in the bottom without obstruction. Tighten the two screws onto the spacers.
8.
Turn on the circuit breakers to the -48 volt DC power supply.
9.
Locate the power switch for the DC inlet you have selected, and turn the power switch
ON
by pushing it to
1
. The unit will begin power-up and system check immediately.
Warning:
If at a later time you need to access internal components, turn
OFF
the unit and the -48 VDC power supply, and disconnect the harness from the
DC inlet on the SDM-9600 DC chassis to avoid electrical shock and damage to
the unit.
4.8.2
System Status on Power-up
On power-up the SDM-9606 blades execute program decompression, Signaling Engine
software load and system test.
You can follow the system status from the console (see next section), or by watching the
LEDs on the front of the blades.
Table 4-1
shows the various LED states that occur during
SDM-9606 initialization sequence (after a power-on or software reset).
NOTE:
The entire startup sequence is executed within 30 seconds. Some of its stages
are brief, and may be difficult to distinguish from the rest..
Stage
OOS
ST
ALM
H/S
Current Status of the Unit
1
Amber
Blink
Blink
Blink
Quick hardware test by the boot-
strap; lamp test on all LEDs. Blink-
ing and frequent color changes
occur during this stage
2
Green
Red
Green
Off
Hardware initialization by the boot-
strap
3
Green
Red
Off
Off
Bootstrap is running. Preparing to
start the boot sector
4
Green
Amber
Off
Off
Boot sector is running. Validating
the application
5
Green
Amber Amber
Off
Boot sector is running. Decom-
pressing the application
Table 4-1: SDM-9606 Front Panel LED States During Normal Initialization Sequence
Summary of Contents for NetPerformer SDM-9600
Page 1: ...NetPerformer SDM 9600 with SDM 9606 Blades Hardware Installation Guide...
Page 6: ...Memotec Inc 7 4 Network Management and Security 7 5 Index 7...
Page 8: ...Memotec Inc...
Page 10: ...Memotec Inc...
Page 11: ...1 Memotec Inc 1 1 Preface...
Page 22: ...SDM 9600 with SDM 9606 Blades Hardware Installation Guide 1 12 Memotec Inc...
Page 23: ...2 Memotec Inc 2 1 Compliance Information...
Page 34: ...SDM 9600 with SDM 9606 Blades Hardware Installation Guide 2 12 Memotec Inc...
Page 35: ...3 Memotec Inc 3 1 Unpacking the SDM 9600...
Page 39: ...4 Memotec Inc 4 1 Hardware Installation...
Page 63: ...5 Memotec Inc 5 1 Product Description...
Page 81: ...6 Memotec Inc 6 1 Troubleshooting Tips...
Page 84: ...SDM 9600 with SDM 9606 Blades Hardware Installation Guide 6 4 Memotec Inc...
Page 85: ...7 Memotec Inc 7 1 Networking Features...
Page 90: ...SDM 9600 with SDM 9606 Blades Hardware Installation Guide 7 6 Memotec Inc...
Page 93: ...SDM 9600 with SDM 9606 Blades Hardware Installation Guide Index 9...