Assembly instructions
Step 4
A. Attach the Upper frame(1) onto the cross bar of the power rig(8479523) and then secure them with
2X
M10X70 Carriage bolt
(
20
)
,1Xbracket
(
5
)
,2X Ø10mm Washer (26), and 2XM10 Aircraft nut(27).
B. Attach
the 3510 mm upper cable(28) through the opening of the upper frame(1), Make sure that the
ball stopper should be underneath the upper cable(28). Place 1
ST
XØ78 pulley(7) underneath the cable,
and secure the pulley with 1XM10X60 Allen bolt(22),2X Ø10mm Washer (26),2Xbushing(9) and 1XM10
Aircraft nut(27).
C. Draw the cable backwards and through the second opening , Place the 2
nd
pulley(7) and secure the
pulley with the same way in B.
D. Draw the cable around the pulley and downwards,Place the 3
rd
pulley(7) onto the cable,Secure the
2XDouble floating pulley bracket(4),2Xpulley cover(8) together with 1XM10X40 Allen bolt(23),2X
Ø10mm Washer (26),and 1XM10 Aircraft nut(27).
E. Draw the cable around the pulley and upwards and through the opening of the vertical frame
(
6
)
,Place
the 4
th
pulley underneath the cable, Secure the pulley with the same way in A.
F. Draw the cable around the pulley and downwards, Secure the end of the upper cable to the hook of the
weight plate holder(3)with the 1xM10X30 Allen bolt(24),2X Ø10mm Washer (26) and 1XM10 Aircraft
nut(27).
G. Attach the
Rear stabilizer
(2) to the lower cross beam of the power rig(8479523) ,align the holes and
secure them together with 1X bracket (5),2xM10X70 carriage bolt(20),2X Ø10mm Washer (26),and
2XM10 Aircraft nut(27).
8