background image

7

12

12

7

Step 7

Place the first three roof support 

bars inbetween the front and back

panels, aligning with the central

uprights, fix into place by screwing

through the panels into the 

roof support bars (

fixing through

the front and rear panels

).

Repeat this process with the 

remaining support bars.

*Hint: Use a roof sheet to mark

out the positions for the 

remaining roof support bars,

measuring out from the centre.

14x70mm Screws

Pre drill 

hole

70mm 

screw

Step 8

Attach the 2x eaves frames (

No. 12

) to 

2x roof sheets (

No. 7

) using 4x30mm 

screws pereaves frame.

*Ensure the eaves are flush to the 

edges of the roof sheet.

*

For T&G roof options use the same

method as stated above ensuring the

eaves framing is flush with the edge

of the roof framing and screwed directly

through the eaves framing into the

roof framing and not into the T&G

boards.

16x40mm Screws

Pre drill 

hole

30mm 

screw

11

12

12

7

P 4

Please retain product label and instructions for future reference

             

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

*OSB OPTION

*T&G OPTION

3

1

a

a

a

a

a

a

b

b

b

b

Step 5

Following the same method outlined

in step 4, place the next 2 panels onto

the floor and secure in place using

6x50mm screws.

6x50mm Screws

Pre drill 

hole

50mm 

screw

a

a

a

b

b

b

b

Step 6

Continue to follow the method 

outlined in step 4. Place the 

remaining gable and window 

panel onto the floor and fix using

9x50mm screws.

9x50mm Screws

4

2

a

a

a

a

a

a

Pre drill 

hole

50mm 

screw

*If you have purchased the T&G floor and 

roof option please continue to 

step 8

Summary of Contents for 01DDPENT1408-V3

Page 1: ... as soon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect against rot and decay and a waterproof treat ment to prevent water ingress Pressure Treated buildings Require a waterproof treatment to prevent water ingress Log Cabins Are supplied untr...

Page 2: ...4 1947 PT3 Eaves Frame 28 x 28 x 2132mm QTY 4 FS2828 2132 PT3 T Hinge QTY 6 PI 07 0021 Turn Button QTY 1 PI 07 0034 Pad Bolt QTY 1 PI 07 0035 Plastic Window Cill QTY 1 PI 08 0013 Styrene 550x550mm QTY 2 PI 05 0114 Nail Bag 50mm Screw x 80 Felt Tacks x 220 20mm Screw x 23 30mm Black Screw x 1 70mm Screw x54 40mm Screw x 16 30mm Screw x 102 P 2 01DDPENT1408 V3 01DDPENT1407 V3 Please retain product l...

Page 3: ...lace with 2x20mm screws per strip 52x30mm Screws 4x20mm Screws a b c Pre drill hole 30mm screw 20mm screw a b c 9 16 9 9 9 17 17 9 9 9 9 Step 3 Window side assembly Cut 7x No 9 strips to 515mm and secure 4x No 9 strips to the inside of the window gap using 2x20mm screws per strip Ensure the strips are flush with the framing Place the plastic cill on top of the board and rest the styrene in the win...

Page 4: ...e the same method as stated above ensuring the eaves framing is flush with the edge of the roof framing and screwed directly through the eaves framing into the roof framing and not into the T G boards 16x40mm Screws Pre drill hole 30mm screw 11 12 12 7 P 4 Please retain product label and instructions for future reference OSB OPTION T G OPTION 3 1 a a a a a a b b b b Step 5 Following the same metho...

Page 5: ...100mm intervals 219xFelt Tacks Felt tacks Felt size 4390mm 18 18 18 18 Step 12 Measure the side of the roof cut 2x No 18 facias to size and fix in place using 3x30mm screws Measure the distance between the 2 facias at the front of the building cut 2x No 18 facias to match the gap Secure to the building using 6x30mm screws 12x30mm Screws Cut down to fit Pre drill hole 30mm screw a If you have purch...

Page 6: ...g 2x30mm screws Ensure the block sits below the door head Secure the turn button to the block with 1x30mm black screw Making sure the turn button catches on the door head 2x30mm Screws 1x30mm Black Screws Pre drill hole 30mm screw It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly pee...

Page 7: ...P 7 Please retain product label and instructions for future reference Please retain product label and instructions for future reference ...

Reviews: