4m Capping Felt QTY 1

PI-01-0020

P 2

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

LOCATION FOR YOUR GARDEN BUILDING

A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance, 

annual treatment and to allow air flow around the building.

Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing 

damage to the building.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy 

or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-

ment to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base 

dimensions,  The base should be slightly smaller than the external measurement of the building, i.e. The cladding 

should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above 

the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

01DTPRMSHPN1206DDOP-V1

Overall Dimensions:

Width = 3566mm 

Depth = 1885mm 

Height = 2170mm

Base Dimensions: 

Width = 3506mm 

Depth = 1753mm 

Please retain product label and instructions for future reference

             

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

5

6

Roof QTY 2

AI-S21MBPR1771X1874-V1

Back Panel QTY 2

AI-S21SHPP1418X1774-V1

Side Panel QTY 2

AI-S21SHPPTOV1760X1753-V1

2

3

4

1

Window Panel QTY 1

AI-01S21SH1LFW1418X2079-V1

Door Panel QTY 1

AI-01S21SHDD1418X2079-V1

Door QTY 2

AI-S21FBMBZBD551X1742-V1

Floor QTY 2

AI-R11MBF1753X1753-V1

10

9

Right Gable Top QTY 1

AI-S21SHPGTR1760X342-V

1

Left Gable Top QTY 1

AI-S21SHPGTL1760X342-V1

Framed Window QTY 1

AI-FW1000X540-V1

Fascias 12x90x1898mm QTY 2

S1290-1898MM

11

Door Block 27x44x160mm QTY 4

F2744-160MM

12

Ridge Bar 27x70x1715mm QTY 2

F2770-1715MM

13

14

Eaves Framing 28x28x1771mm QTY 4

FS2828-1771MM

15

Door Beading Strips 12x40x1686mm QTY 2

S1240-1686MM

16

Door Cover Trims 12x56x860mm QTY 1

S1256-860MM

18

Window Cover Trim 12x56x1038mm QTY 1

S1256-1038MM

19

Cover Trims 12x56x1770mm QTY 4

S1256-1770MM

20

Cover Trims 12x5x2072mm QTY 4

S1256-2072MM

21

Fascias 12x90x1771mm QTY 4

S1290-1771MM

U-Channel QTY 1

PI-07-0013

Corner Brace QTY 2

PI-07-0012

Green Felt QTY 1

PI-01-0016

Butt Hinge QTY 2

PI-07-0066

T-Hinge QTY 6

PI-07-0021

Lock Hasp QTY 1

PI-07-0221

Turn Button QTY 4

PI-07-0034

Casement Stay QTY 1

PI-07-0007

Padlock QTY 1

PI-07-0222

17

Door Cover Trims 12x56x820mm QTY 1

S1256-820MM

7

8

2079mm Front Panel QTY 1

AI-S21SHPPTF594X2079-V1

1774mm Back Panel QTY 1

AI-S21SHPP594X1774-V1

Summary of Contents for 01DTPRMSHPN1206DDOP-V1

Page 1: ...avoid placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditio...

Page 2: ...S21SHPGTL1760X342 V1 Framed Window QTY 1 AI FW1000X540 V1 Fascias 12x90x1898mm QTY 2 S1290 1898MM 11 Door Block 27x44x160mm QTY 4 F2744 160MM 12 Ridge Bar 27x70x1715mm QTY 2 F2770 1715MM 13 14 Eaves...

Page 3: ...floors together using 12x50mm screws through the floor bearers in an alternating pattern Once fixed together turn the floor back the right way up 10x50mm Screws Step 1 Parts needed No 1 QTY 2 SECONDA...

Page 4: ...t the ends using 3x50mm screws Do not secure the building to the floor until the roof has been fitted Position the panels so there is equal spacing between the floor and cladding on all sides 9x50mm S...

Page 5: ...d secure to the central uprights with 2x30mm screws per bracket No 28 as shown in the illustration Ensure the ridge bar is flush with the top framing of the gable tops 4x30mm Screws 14 14 28 Step 10 P...

Page 6: ...ing and into the ridge bar 6x100mm Screws 100mm screw Pre drill hole 26 26 16 17 14 Step 12 7 7 Fix the roofs No 7 to the top of the building ensuring the side edges are flush with the building and th...

Page 7: ...o 13 QTY 4 No 19 QTY 2 No 26 QTY 2 13 a 26 26 13 25 25 Step 17 Parts needed No 31 QTY 1 Pre drill hole 20mm screw 31 Fix the casement stay No 31 to the window and then align the fixings to the window...

Page 8: ...0mm Carriage Bolts and Nuts Felt tacks Step 19 Parts needed No 32 QTY 1 No 33 QTY 1 Cut the Felt No 32 and the Capping Felt No 33 in to sheets at 3650mm each Lay onto roof as shown in diagram ensuring...

Page 9: ...side of the building ensuring they are flush to the top of the building secure using 3x40mm screws per fasica 18x40mm Screws 23 22 22 22 22 23 Pre drill hole 40mm screw It is ESSENTIAL that you apply...

Page 10: ...2 1 3 4...

Page 11: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...